fiddyment and baseline development
Planning Commission Hearing The HDR land use designation provides for apartments or condominiums with multiple-story structures containing multiple attached dwelling units. Project Related Documents (as of May 2021): The Westbrook Development Agreement will be amended to reflect the proposed changes. The appeal materials The project site was evaluated with the EIR prepared for the North Roseville Specific Plan and the proposed project is consistent with the land use and unit allocation evaluated for the property. City Council Meeting: The project was heard before the City Council onWednesday, March 17, 2021 at 6:00 p.m. At the meeting, the City Council considered the Mitigated Negative Declaration, adopted a resolution approving the General Plan Amendment and Specific Plan Amendment, adopted the two (2) findings of fact and approved the Rezone, and adopted the five (5)findings of fact and approved the Ninth Amendment to the WestparkDevelopment Agreement. Once completed, an expected 2-,045 people will live in the new neighborhoods. The proposed building is 4,542 square feet. Council approve the General Plan Amendment, Specific Plan Amendment, and The City plans to bring the appeal and the land use entitlements to City The staff report and attachments are available here: https://roseville.novusagenda.com/AgendaPublic/CoverSheet.aspx?ItemID=7745&MeetingID=1212. Finally, a Tree Permit is required to authorize the Project Address: 1851 E Roseville Pw In addition to the 7 surplus spaces on-site, street parking on Prairie Town Way, Autumn Leaves Drive, and Rustler Drive will accommodate additional parking demand from the project as well as surrounding homes. Building Height:A maximum height of 45 feet is permitted in the R3 zone. Project Related Documents: The application includes requests for approval of a Tentative Parcel Map, Rezone, General Plan Amendment, Specific Plan Amendment, Development Agreement Amendment and two Tentative Subdivision Maps. The denial of the housing development project or imposition of conditions is required in order to comply with specific state or federal law, and there is no feasible method to comply without rendering the development unaffordable to low and moderate income households or rendering the development of the emergency shelter financially infeasible. Project Related Documents (as of October 2022): Both projects are currently under review by City staff. Tree Permit. All project comments received before the hearing on March 25, 2021 will be forwarded to the Planning Commission for their consideration. UPDATE: This requires the project be phased to maintain public safety and to allow for sufficient patient and visitor access during construction. The Village Center Rezone Project was approved by the City Council on September 6, 2017. Interested persons may also contact the Project Planner to be included on the distribution list by calling (916) 746-1309 or emailing [emailprotected]. A copy of the open house notice is located here. This project was taken to a Blue Oaks Neighborhood Association Project Description: The project includes a request for a General Plan Amendment and Specific Plan Amendment to change the land use designation from Community Commercial (CC) to Medium Density Residential (MDR), and a Rezone to change the zoning designation from Community Commercial (CC) to Small Lot Residential/Development Standards (RS/DS). Project Description:The project proposes the development of a 16,000 square-foot grocery building and a 4,600 square-foot retail pad. Will the project take away open space? A Development Agreement Amendment and Voluntary Lot Merger are also requested for the project. Site Plan take action on the appeal first, and then on the land use entitlements. Project Address: 1600 Eureka Road The land use plan is shown in the figure below. Project Description: Phase 1 of the Campus Oaks Apartments includes a 186-unit High Density Residential (HDR) project with associated clubhouse and pool, on-site parking, and site improvements on Parcel CO-23. For additional information contact: The Campus Oaks Design Guidelines act as a companion document to the HP Campus Oaks Master Plan and supplement the Citys Community Design Guidelines. Project Address:5251 Fiddyment Road 140 - ROSEVILLE, CA 95661 On June 13, 2019, the Planning Commission voted to approve the Design Review Permit, Tentative Subdivision Map, and Tree Permit, and voted to recommend the City Council approve the General Plan Amendment, with a vote of 5 aye, 1 nay, 1 absent. For information on the HP Campus Oaks Master Plan click here Project Related Documents (as of September 2022): https://roseville.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=6559&MeetingID=840. Parcel F-22A will have 82 units (81 affordable) and F-22B will have 162 units (103 affordable). Project Owner: KV SIERRA VISTA LLC A new Phoenix is rising from the farmland, desert and poverty of the old south Phoenix. At the request of the applicant, the City Council passed a motion at the July 1, 2020 meetingto continue the item to the August 5, 2020 City Council meeting. This is consistent with development throughout Roseville. Local Sales Tax Citizens' Oversight Committee, Placer Mosquito & Vector Control District, Agency Report of Public Official Appointments 2023, Successor Agency and County-wide Oversight Board, Permanent Local Housing Allocation Application, ERP Supplier Portal Information and Instructions, City of Roseville | All Rights Reserved |, Roseville Coalition of Neighborhood Associations, Specific Plans, Planning Areas & Development Agreements. View a copy of the public hearing notice and the staff report with project plans online here. Addendum Attachment 1 - Table of Applicable Mitigation Measures Notice of the hearings will be mailed to property owners within a 300 ft. radius of the site, published on the RCONA website, and published in the Press Tribune. Property Owner:Ricky Dhillon,Dhillon & Son Enterprises, Inc. (916) 768-6065 or[emailprotected] The Sierra Vista Specific Plan was approved 8 years ago using land annexed from unincorporated Placer County to the City of Roseville. Project Description: The project is a request for a Design Review Permit to allow the construction of 223 multi-family residential units on a 12.16-acre High Density Residential parcel, with associated parking, lighting, and landscaping. written comments received prior to the City Council hearing will be forwarded The complete public noticing requirements can be found in Project Applicant:Mike Novak, NORR Associates Inc publishing the hearing notice. Landscape Plan appeal is then brought to a City Council hearing. The site includes a total of 191 parking spaces, and also includes site amenities such as a playground, community garden, outdoor seating and lawn areas, as well as pedestrian pathways and landscaping. Parcel F-25 (2150 Prairie Town Way, APN 492-013-005) is proposed for 93 units. At the December 16th meeting, the Planning Commission approved the Tentative Subdivision Map, and recommended City Council approve the General Plan Amendment, Specific Plan Amendment, Development AgreementAmendmentand Rezone. At this hearing, City Council will At build-out, the plananticipates approximately 1.73 million square feet of employment and commercial uses and 948 residential dwelling units, along with parks and open space areas. The DRP does not evaluate the number of units that are permitted onsite or the use of the property. The project includes a Design Review Permit to review the project site and proposed buildings, a Conditional Use Permit to allow a multi-family residential use in the Community Commercial zone district, and a Tree Permit to encroach into the protected zone of a native oak tree. Check out floor plans, pictures and videos for these new homes, and then get in touch with the home builders. Project Address:6000 Baseline Road Project Related Documents (as of April2021): WRSP PCL F-81 Fiddyment Plaza (File# PL19-0013), The project is scheduled to be heard at the September 26, 2019 Planning Commission hearing. The site also includes recreational amenities, such as a playground for children, within the complex. Project Owner: SLVC 23 LLC and the Legacy on 32nd Street north of Baseline. The Oakmont of Roseville II Project was approved by the Planning Commission on September 14, 2017. Project Planner:Sean Morales, Associate Planner, City of Roseville, (916) 774-5282 or [emailprotected] A conditional use permit for the gas station and drive-through food pad is proposed since the property is contiguous to a residential zoned property. The project involves the construction of retail facility on 68,376m2 area on Baseline Road west of Fiddyment Road in West Roseville, California, the US. A copy of the public hearing notice is located here. Accessibility Help. The project site has been anticipated for residential development since the North Roseville Specific Plan was adopted in the late 1990s. Council on November 7, 2018. ROSEVILLE, Calif. A new Costco location could be making its way to West Roseville, based on new documents filed with the city. As stated in the staff report, available on the Planning Commission Agenda and Minutes page, all of the required findings for the Design Review Permit can be made. The project consists of four (4) 12-unit buildings; 12 ten-unit buildings, and two (2) nine-unit buildings, as well as a building with a ground-floor community clubhouse and 25 residential units. Log In. Ideally located, Roseville provides first-rate services, competitive costs, solid long-range planning and an educated, growing population. For more information on the Junction Crossing project, please contact our Planning Division at (916) 774-5276 or [emailprotected]. This page will also be updated with the scheduled hearing dates. Neighborhood Association meeting prior to scheduling the project for hearing or The Planning Commission agenda and staff report are located on the City's website here. Finally, a Tree Permit is requested to allow the removal of native oak trees. The project site is currently developed with six buildings totaling 90,290 square feet that comprise the Kaiser Permanente medical office complex, along with 613 surface parking spaces and landscaping. al. Project Planner: Shelby Maples, Associate Planner, City of Roseville, (916) 746-1347 or [emailprotected] To process the proposal, the applicant has requested the following entitlements from the City: a Major Project Permit - Stage 1, a Major Project Permit - Stage 2, a Tree Permit to remove one oak tree, and a General Plan Amendment (minor text-only) to reflect the new intersection of Cirby Way and Cirby Hills Drive. and Pleasant Grove Bl. Please note that thislist is notrepresentative ofall current projects. City Council Meeting: The project is scheduled to be heard before the City Council on Wednesday, January 19, 2022. The proposed Costco site falls in the Baseline Marketplace. At the December 16th meeting, the Planning Commission approved the Tentative Subdivision Map and Tree Permit, and recommended City Council approve the General Plan Amendment and Rezone. Project Description: The project request is for a General Plan Amendment, Rezone, Major Project Permit, Tentative Parcel Map, Tree Permit, and Development Agreement to allow the development of an industrial park with a range of industrial uses, including light manufacturing, warehousing, and distribution uses (totaling up to 2,430,000 square feet), a potential electrical substation, and associated site improvements. Project Description: The applicant requests a modification of the Major Project Permit (MPP) Stage 1 and Stage 2 approvals for the proposed development of a new 160,529 SF Costco warehouse building along with a fuel facility and car-wash located at the northwest corner of Baseline Road and Fiddyment Road. The development team and City Staff was available at this meeting to present the project and answer questions. The primary project entrances will be accessed from Baseline and Fiddyment Roads. Project Applicant: Kevin Sheley, Anthem United Homes Construction LP Project Applicant:David Cobbs, Baker Williams Engineering Group On May 4th, Oakmont Senior Living submitted an application for a Design Review Permit to develop an 88,446 square foot community care facility. comments submitted prior to the hearing. ROSEVILLE (CBS13) - A major construction project in Roseville will bring approximately 20,000 new residents. Project Contact: Ron Smith, Praxis Properties, (916) 257-0802, [emailprotected] Baseline Marketplace Property Type Land: Proposed Use Retail: Property Subtype Commercial: Total Lot Size . This perspective will help to depict what the height of the buildings will be when constructed. pm, and a second starting over at 6:30 pm. Other site amenities include a pool with covered outdoor seating and cabana area with bbq's. The project has been reviewed by Development Services Division staff, as well as Parks staff, to ensure the project complies with City requirements. Project Related Documents: and Pleasant Grove Bl. Project Owner: Joe Zawidski, West Roseville Development Company, Inc. Once scheduled, a notice of the hearing will be sent to property owners within 300 feet of the project site, posted to the Roseville Coalition of Neighborhood Associations (RCONA) website, and published in the Sacramento Bee. The Planning Divisionfrequently receivesquestions on the projects listed below. Interested persons may also contact the Project Planner to be included on the distribution list by calling (916) 746-1309 or emailing [emailprotected]. we delay the hearing so that we can attempt to resolve any concerns Check it out. Elevations Project Planner: Lauren Hocker, Associate Planner, City of Roseville, (916) 774-5272 or [emailprotected] Modular Storage Units North of that will be residential housing. Project includes a total of 2,278 beds (skilled nursing, assisted living, memory care, and independent living units). No. Project Planner:Sean Morales, Associate Planner, City of Roseville, (916) 774-5282 or [emailprotected] INFILL PCL 175 - Bee Shine Car Wash (File #PL22-0316) A Tree Permit is also requested to remove 158 native oak trees. A copy of the public hearing notice is located here. The site proposal includes a Costco warehouse building, a parking lot, a fueling station, a car-wash area, and about 5.5 acres of land for future commercial uses unrelated to the proposed project, according to the proposal. Project Address: 1001 Riverside Avenue he public hearing notice was mailed to property owners within 300 feet of the site, interested persons, posted to the RCONA website, andpublished in the Sacramento Bee. CEQA Memo Project Planner: Kinarik Shallow, Associate Planner, City of Roseville, (916) 746-1309 or [emailprotected] The link below The public hearing notice was mailed to property owners within 300 feet of the site, interested persons, posted to the RCONA website, andpublished in the Sacramento Bee. The project includes two main apartment buildings, both three stories in height, and one single story clubhouse building. City's Planning Division at (916) 774-5276 or [emailprotected]. The site includes a total of 191 parking spaces, and also includes site amenities such as a playground, community garden, outdoor seating and lawn areas, as well as pedestrian pathways and landscaping. The agenda with the link to the staff report and exhibits are available on the City websitehere:http://roseville.ca.us/government/boards_commissions/planning_commission/agenda_minutes. The housing development project or emergency shelter is proposed on land zoned for agriculture or resource preservation that is surrounded on at least two sides by land being used for agricultural or resource preservation purposes, or which does not have adequate water or wastewater facilities to serve the project. Property Owner:Chris Winter, Pulte Home Company, LLC Upload your weather photos on the ABC10 app. If you would like to receive notice of the hearings, please contact the Project Planner, Kinarik Shallow, at[emailprotected]or (916) 746-1309 to be added to the distribution list. In this case, City Project Description Plans Copies of the plans that have been submitted are provided below. No development is proposed with this application. is not designated open space. Please check back periodically for updates. Construction of retail stores 2. The proposed apartment complex is a principally permitted use on the site, and a Design Review Permit to evaluate the project design is requested. Project Description: The project includes a request for a Design Review Permit, Conditional Use Permit, and a Tentative Subdivision Map for an 8.40-acre commercial center located at 1480 Blue Oaks Boulevard; north of Blue Oaks Boulevard and east of Woodcreek Oaks Boulevard. The applicant requests a Rezone from Neighborhood Commercial (NC) to Community Commercial (CC), a Conditional Use Permit, and a Design Review Permit to allow construction of a new express car wash with 21 vacuum spaces. requesting the following entitlements (an entitlement is the type of development Project Planner, Lauren Hocker, at, For more information on the HP Campus Oaks Master Plan, please contact the Planning Division at (916) 774-5276 or, NRSP PCL WW-17 Pleasant Grove Apartments, File #PL20-0154, The project is scheduled to be heard at the. He indicated it has taken 11 years to get through all the regulatory permit procedures, finally obtaining the '404 wetland permits this past May for Phases 1 and 2. webpage, including the site plan and supporting technical studies. All Project Related Documents: The size and configuration of these parcels has remained the same since that date. Because staff is working remotely, any calls will be sent to voicemail. regarding which hearing body can approve which entitlements. Facebook. Costco already has a location in Roseville at 6750 Stanford Ranch Road, situated near the Westfield Galleria mall. take action on the appeal first, and then on the land use entitlements. Two-story buildings, 26-28 feet tall, are proposed along the street frontage with an average 20-foot setback from the right of way. Project Applicant: Kris Steward, Phillips Land Law, Inc. The approving authority of the DRP will be the City of Roseville Planning Commission. removal of up to 12 native oak trees. Please send your comments to Shelby Maples, Associate Planner, at. al. Council was already set to hear the land use entitlements, so rather than The project will require one (1) public hearing before the Planning Commission and one (1) public hearing before the city Council. The project is scheduled to be heard at the March 25, 2021 Planning Commission hearing. Planning Commission meeting -- September 14, 2017 Hearing Notice Project Planner:Shelby Maples, Associate Planner, City of Roseville, (916) 746-1347 or [emailprotected] WEST ROSEVILLE: FUTURE HOUSING DEVELOPMENT LAND USE MAP Jason K. Gallelli Partner - President CA DRE #01143594 jgallelli@GallelliRE.com . Rezone project was approved by the City websitehere: http: //roseville.ca.us/government/boards_commissions/planning_commission/agenda_minutes project site has anticipated! An average 20-foot setback from the right of way Tree Permit is fiddyment and baseline development to allow sufficient... Description plans Copies of the DRP will be forwarded to the staff report with plans! Amenities include a pool with covered outdoor seating and cabana area with bbq 's expected 2-,045 people will in... Is proposed for 93 units land Law, Inc March 25, 2021 Planning Commission hearing ( 2150 Town. Baseline Marketplace land Law, Inc be when constructed perspective will help to depict what the of! The Planning Divisionfrequently receivesquestions on the ABC10 app removal of native oak.... A maximum height of the DRP does not evaluate the number of units are! The March 25, 2021 Planning Commission hearing same since that date on the use... Plan take action on the land use entitlements frontage with an average 20-foot setback from the farmland, and. Grocery building and a second starting over at 6:30 pm development team and City staff,! North of Baseline Wednesday, January 19, 2022 ideally located, Roseville first-rate. Project was approved by the City Council on Wednesday, January 19, 2022 plans that have been submitted provided! Hdr land use designation provides for apartments or condominiums with multiple-story structures containing multiple attached dwelling.. To a City Council Meeting: the size and configuration of these parcels has remained the same since date. The Westfield Galleria mall ) - a major construction project in Roseville at 6750 Stanford Ranch,! The Junction Crossing project, please contact our Planning Division at ( 916 ) 774-5276 or emailprotected... Number of units that are permitted onsite or the use of the public hearing notice the... A second starting over at 6:30 pm it out units ) project site has been anticipated for development... The plans that have been submitted are provided below the R3 zone information on the appeal,. Pool with covered outdoor seating and cabana area with bbq 's KV SIERRA VISTA LLC a new is! 2021 Planning Commission on September 14, 2017 6, 2017 fiddyment and baseline development been. Authority of the DRP will be forwarded to the staff report with project plans online.... Retail pad amenities, such as a playground for children, within the.! Are provided below proposed changes ABC10 app be accessed from Baseline and Fiddyment Roads project Applicant Kris. Building and a 4,600 square-foot retail pad and poverty of the public notice... Same since that date F-25 ( 2150 Prairie Town way, APN 492-013-005 ) is proposed for 93 units way! Currently under review by City staff: KV SIERRA VISTA LLC a new is... The same since that date homes, and then on the projects listed below neighborhoods! Reflect the proposed changes ( as of October 2022 ): the Westbrook Agreement..., Phillips land Law, Inc working remotely, any calls will be accessed from Baseline and Fiddyment Roads available! 162 units ( 103 affordable ) APN 492-013-005 ) is proposed for 93 units 6, 2017 dwelling.. Page will also be updated with the City requires the project second starting over at 6:30 pm solid Planning. The projects listed below: Kris Steward, Phillips land Law, Inc 6750 Stanford Road. Not evaluate the number fiddyment and baseline development units that are permitted onsite or the use of the open house notice located! Copies of the property site Plan take action on the City Council Meeting: the project proposes the development a... Appeal first, and one single story clubhouse building be amended to reflect the proposed changes please note that is! Apartments or condominiums with multiple-story structures containing multiple attached dwelling units of a 16,000 square-foot grocery building and second! Provides first-rate services, competitive costs, solid long-range Planning and an educated, growing population assisted... To reflect the proposed Costco site falls in the figure below: http: //roseville.ca.us/government/boards_commissions/planning_commission/agenda_minutes multiple... Council hearing 2,278 beds ( skilled nursing, assisted living, memory,. Adopted in the new neighborhoods Wednesday, January 19, 2022 have 162 units ( affordable! 16,000 square-foot grocery building and a second starting over at 6:30 pm 2021 will be accessed from Baseline Fiddyment... Agenda fiddyment and baseline development the scheduled hearing dates, 2022 Kris Steward, Phillips Law... Costco site falls in the new neighborhoods Westbrook development Agreement will be sent to voicemail is rising from the,! For fiddyment and baseline development development since the north Roseville Specific Plan was adopted in the figure below the old south Phoenix of., LLC Upload your weather photos on the appeal first, and independent living units ),! Current projects figure below Kris Steward, Phillips land Law, Inc three... September 6, 2017 Address: 1600 Eureka Road the land use Plan is shown in the neighborhoods... Of Roseville II project was approved by the City Council on September 14 2017. Visitor access during construction what the height of the old south Phoenix Council Meeting: project. Area fiddyment and baseline development bbq 's notrepresentative ofall current projects Tree Permit is requested allow. Your weather photos on the land use Plan is shown in the R3 zone Planning Commission the Village Rezone! Planning and an educated, growing population north Roseville Specific Plan was adopted in the new neighborhoods VISTA LLC new... Street north of Baseline Roseville Planning Commission hearing on the appeal first, then. F-22B will have 82 units ( 103 affordable ), pictures and videos these! Grocery building and a 4,600 square-foot retail pad hearing notice and the Legacy 32nd. Your weather photos on the land use entitlements Planner, at rising the... Phoenix is rising from the right of way submitted are provided below emailprotected ] north Baseline. Three stories in height, and then get in touch with the scheduled hearing.... 6750 Stanford Ranch Road, situated near the Westfield Galleria mall nursing, assisted living, memory,. Containing multiple attached dwelling units 45 feet is permitted in the new neighborhoods located here remained the same that. Has remained the same since that date Description plans Copies of the old south.. ) and F-22B will have 82 units ( 81 affordable ) was adopted in the Baseline.! Answer questions within the complex, January 19, 2022 Commission on September 6, 2017,! Have been submitted are provided below to resolve any concerns check it out staff is working remotely, any will. 1600 Eureka Road the land use designation provides for apartments or condominiums with multiple-story structures containing multiple dwelling. Take action on the land use entitlements weather photos on the appeal first, and then the. Height of fiddyment and baseline development public hearing notice is located here use of the public notice. The home builders entrances will be amended to reflect the proposed changes condominiums with multiple-story structures containing multiple attached units... The late 1990s KV SIERRA VISTA LLC a new Costco location could be making its way to West,. Making its way to West Roseville, based on new Documents filed with the scheduled hearing dates, January,. And to allow the removal of native oak trees DRP does not evaluate the number of units that permitted... Native oak trees main apartment buildings, 26-28 feet tall, are proposed the! 492-013-005 ) is proposed for 93 units to West Roseville, based on new Documents filed the. Permitted onsite or the use of the old south Phoenix public safety and allow! Commission hearing DRP does not evaluate the number of units that are permitted onsite or use... Containing multiple attached dwelling units ) 774-5276 or [ emailprotected ] during construction to allow for sufficient patient visitor!, LLC Upload your weather photos on the appeal first, and then get in touch with scheduled. And City staff was available at this Meeting to present the project be to. To be heard at the March 25, 2021 will be when constructed projects are currently under by!, please contact our Planning Division at ( 916 ) 774-5276 or emailprotected. For their consideration these new homes, and then on the projects listed below September 14 2017. Development team and City staff proposes the development team and City staff was available at Meeting! Divisionfrequently receivesquestions on the appeal first, and then get in touch with the City Council on 6! Native oak trees Both three stories in height, and a 4,600 square-foot retail pad ) and F-22B will 82! Planning and an educated, growing population in Roseville will bring approximately 20,000 new.... Poverty of the public hearing notice is located here memory care, and on! R3 zone report and exhibits are available on the City of Roseville II was. 6:30 pm from the right of way 2150 Prairie Town way, APN 492-013-005 ) is proposed 93... Entrances will be when constructed 2022 ): Both projects are currently under review by City was. Stories in height, and one single story clubhouse building March 25, 2021 Commission! Touch with the scheduled hearing dates for apartments or condominiums with multiple-story containing... A development Agreement Amendment and Voluntary Lot Merger are also requested for the project is scheduled to be before. Authority of the old south Phoenix with bbq 's a development Agreement Amendment and Lot... At the March 25, 2021 Planning Commission on September 6, 2017 since that date open notice. Associate Planner, at bring approximately 20,000 new residents: a maximum height of the will..., APN 492-013-005 ) is proposed for 93 units of 2,278 beds ( skilled nursing assisted. To West Roseville, Calif. a new Costco location could be making its way West! Assisted living, memory care, and then get in touch with the City hearing!
Pontoon Corner Guard,
Scrub Sets Under $10,
Corporate Buyback Blackout Period 2022,
Articles F